HOME

日本語
Inquiry

Installation Results

●Atsumitec Co., Ltd.
Installation Timing: May, 2024 / Double-Stacking Vertical-Axis Wind Power Generator : 1 unit
In May 2024, Atsumitec Co., Ltd., located in Takaoka, Chuo-ku, Hamamatsu City, Shizuoka Prefecture installed the Wind Power Generator at their site.
They are adopting the Double-Stacking Vertical-Axis Windmill supplied by Global Energy.
The news on their website dated May 15, 2024 states, "New business: Demonstration experiment of "Micro-Wind-Power Generator" begins."

●Camon Mare, Nagisa-no-Koban (Seaside Patrol Station) in Yamagata Prefecture
Installation Timing: June, 2023 / Double-Stacking Vertical-Axis Wind Power Generator : 1 unit




●Con Colar at Hachijo-jima Island in Tokyo Prefecture
Installation Timing: March, 2022 / Double-Stacking Vertical-Axis Wind Power Generator : 1 unit


●Saitama New Urban Center in Saitama Prefecture
Installation Timing: April, 2021 / IoT Station : 1 unit


●TV Kanagawa tvk Housing Plaza Yokohama in Kanagawa Prefecture
Installation Timing: February, 2020 / Street Light : 5 units / IoT Station : 6 units
For the first time in Japan and overseas, a Bellsion type Street Lights/IoT Stations were installed at "tvk Housing Plaza Yokohama".
Street light generates hybrid power generations of wind and solar power, stores electricity in the storage battery, and lights LED lights.
IoT station is equipped with Wi-Fi and a security camera.
A tour and an inauguration ceremony were held with participation of many people involved.

●Yuing Shimanto in Kochi Prefecture
Installation Timing: February, 2020 / Street Light : 1 unit

↓

Global Energy Co., Ltd.
1964-1, Kamijima, Hamana-ku, Hamamatsu-shi, Shizuoka-ken, 434-0011, Japan